M01 · Field
BS 5930 · AGS 4.1
Field logging
Capture once, at source
Drilling records, strata descriptions, sampling, and groundwater readings entered on the rig against location and depth interval — offline-tolerant, synced into the central database on connection.
- Offline-first daily records
- BS 5930 description builder
- Photo & core box attachments
- Rig, crew, and shift logging
M02 · Field
ASTM D1586 · Eurocode 7
In-situ testing
Every increment, bound to depth
SPT, CPT, permeability, and pressuremeter records held against their location and depth interval, with method, instrument, and standard version attached to every value.
- SPT increments with refusal handling
- CPT trace import
- Permeability & pressuremeter
- Method and instrument metadata
M03 · Database
AGS 4.1 · BS EN ISO 14688 / 14689
Central geotechnical database
One governed estate
Projects, areas, locations, strata, samples, in-situ tests, lab results, and groundwater observations in a strict parent–child schema, with referential integrity enforced at the database itself.
- Portfolio → project → area → location
- Referential integrity at the database
- Versioned standards as data
- Full record history
Import & migration
Digitised is not verified
Legacy AGS and Excel records enter through the same mapping and four-layer validation as live works — a historical record earns its place in the corpus the way a new one does.
- AGS 4.1 in / out
- Excel round-trip & mapping profiles
- Legacy archive intake
- Quarantine for orphaned records
M05 · Laboratory
BS 1377 · ASTM
Laboratory lifecycle
Request to result, one record
Request, schedule, test, calculate, check, approve, report — the full lifecycle on the sample record, with results autofilled back into logs and report tables.
- Scheduling & capacity view
- Forward-only status ladder
- Checker and signing engineer roles
- Result autofill into logs
M06 · Laboratory
Contract rate schedules
Quantities & IPC
Billed from approved records
Interim payment statements built directly from approved records — quantities your client can trace to the borehole, the sample, and the test. No re-entry, no reconciliation.
- Quantity statements from approved data
- IPC generation & revisions
- Rate schedules per contract
- Client-traceable line items
M07 · Output
BS 5930 · BS 1377
Borehole logs & factual reports
Publication-grade, reviewed from the record
Borehole logs, factual report tables, and factual report drafts drawn directly from approved records — not re-plotted in a spreadsheet. A beta review workflow can comment on scientific consistency, data accuracy, missing evidence, and standards alignment before submission.
- Configurable log layouts
- Factual report generation
- Report review & readiness comments · beta
- Revision control on issued sheets
M08 · Output
BS 1377 · ASTM D4546
Charts & dashboards
Ground truth, plotted
Failure envelopes, consolidation curves, gradations, SPT profiles, and groundwater hydrographs alongside project KPIs, productivity, and submission readiness per area.
- Engineering charts from approved data
- Rig utilisation & lab throughput
- Issue burn-down
- Go / no-go readiness view
M09 · Governance
AGS 4.1 · Client submission specs
Submission control
Nothing leaves unvalidated
Four-layer validation, client-specific submission rules, an issue log with corrections, and a go / no-go readiness view per area before anything leaves the building.
- Four-layer validation engine
- Client rule sets
- Issue log & corrections
- Submission package assembly
M10 · Governance
ISO 9001-aligned workflows
Roles, audit & hosting
Tender-grade accountability
Role-based access across project engineer, data coordinator, QA reviewer, project manager, and admin — with every import, validation, approval, and export audit-logged.
- Role-based access control
- Immutable audit log
- Regional & sovereign hosting
- Signed approval records