Resources
Tools for the submission you have to defend.
Checklist
AGS 4.1 readiness checklist
39 checks across integrity, engineering logic, AGS compliance, plausibility, and governance. Downloadable PDF.
Download →
Assessment
Submission-control readiness check
Eight questions on entry, validation, traceability, and approval — with a tailored summary of where rejections come from.
Start the check →
Migration
Legacy migration planning session
Legacy system support is changing, with end-of-life in December 2028 — and templates don't carry forward.
Plan your migration →
Migration path
Five steps off legacy systems and Excel.
01 / Inventory
Catalogue legacy projects, templates, lab sheets, and Excel workbooks — and the AGS versions they emit.
02 / Map
Build mapping profiles once per archive vintage, normalising depth datums, units, and location IDs.
03 / Validate
Run the same four layers as live data. Orphaned results are quarantined, never imported on trust.
04 / Accept
A named engineer accepts each record into the corpus, with provenance and standard version recorded.
05 / Operate
New works run in G&; the archive is queryable by stratum, formation, test type, or depth interval.
Formats & tools
What G& reads, writes, and coexists with.
AGS 4.1
Native in and out, dictionary-checked
Excel
Round-trip with mapping profiles
Legacy archives
Archive intake before 2028 end-of-life
Design tools
Coexists via open formats
Modelling workflows
Export-ready data
GIS / CSV
Regional coordinate systems preserved